Skip to content

Success stories

Featured projects

A selection of projects where we contributed engineering, supply and commissioning.

Alma Project
Gates Engineering Installation

Alma Project

General Dynamics ๐Ÿ“ San Pedro de Atacama, Chile

Design, fabrication, installation and commissioning of the radar assembly workshop gates โ€” the largest in South America.

Sasipa Project
Tanks Pioneer Potable water

Sasipa Project

SASIPA ๐Ÿ“ Easter Island, Chile

Supply and installation of 8 prefabricated Pioneer tanks for potable water, with a total capacity of 1,500 mยณ. Selected for cost-effectiveness and ease of transport to the island.

Knife valves โ€” Codelco Norte
Valves Mining Anti-abrasion

Knife valves โ€” Codelco Norte

Codelco Norte ๐Ÿ“ Talabre Tailings Dam

Supply of high anti-abrasive knife valves with urethane seats for milling tailings handling. Sizes from 4" to 30" with hydraulic actuation.